2 Chronicles 3:1-9

The Building of the Temple

3:1 Solomon began building the Lord’s temple in Jerusalem on Mount Moriah, where the Lord had appeared to his father David. This was the place that David prepared at the threshing floor of Ornan the Jebusite. 3:2 He began building on the second day of the second month of the fourth year of his reign.

3:3 Solomon laid the foundation for God’s temple; its length (determined according to the old standard of measure) was 90 feet, and its width 30 feet. 3:4 The porch in front of the main hall was 30 feet long, corresponding to the width of the temple, and its height was 30 feet. He plated the inside with pure gold. 3:5 He paneled the main hall with boards made from evergreen trees and plated it with fine gold, decorated with palm trees and chains. 3:6 He decorated the temple with precious stones; the gold he used came from Parvaim. 3:7 He overlaid the temple’s rafters, thresholds, walls and doors with gold; he carved decorative cherubim on the walls.

3:8 He made the most holy place; its length was 30 feet, corresponding to the width of the temple, and its width 30 feet. He plated it with 600 talents of fine gold. 3:9 The gold nails weighed 50 shekels; he also plated the upper areas with gold.