NETBible KJV GRK-HEB XRef Names Arts Hymns

  Discovery Box

2 Chronicles 3:1-3

Context
The Building of the Temple

3:1 Solomon began building the Lord’s temple in Jerusalem 1  on Mount Moriah, where the Lord had appeared to his father David. This was the place that David prepared at the threshing floor of Ornan 2  the Jebusite. 3:2 He began building on the second day of the second month of the fourth year of his reign. 3 

3:3 Solomon laid the foundation for God’s temple; 4  its length (determined according to the old standard of measure) was 90 feet, and its width 30 feet. 5 

Drag to resizeDrag to resize

[3:1]  1 map For location see Map5 B1; Map6 F3; Map7 E2; Map8 F2; Map10 B3; JP1 F4; JP2 F4; JP3 F4; JP4 F4.

[3:1]  2 tn In 2 Sam 24:16 this individual is called אֲרַוְנָא (“Aravna”; traditionally “Araunah”). The form of the name found here also occurs in 1 Chr 21:15; 18-28.

[3:2]  3 sn This would be April-May, 966 b.c. by modern reckoning.

[3:3]  5 tn Heb “and these are the founding of Solomon to build the house of God.”

[3:3]  6 tn Heb “the length [in] cubits by the former measure was sixty cubits, and a width of twenty cubits.” Assuming a length of 18 inches (45 cm) for the standard cubit, the length of the foundation would be 90 feet (27 m) and its width 30 feet (9 m).



created in 0.03 seconds
powered by
bible.org - YLSA